Home
Softono

Fud Ai

Open source MIT Kotlin
213
Stars
41
Forks
9
Issues
1
Watchers
4 months
Last Commit

 About Fud Ai

Fud AI is a Free & Open Sourced AI Calorie Tracker for iOS & Android

Platforms

Web Self-hosted iOS Android

Languages

Kotlin

Need Help Installing Fud Ai?

We provide expert installation service for this software. Our team will install, configure, and secure Fud Ai on your server. plans start at just $30.

Fud AI Logo

Fud AI

Eat Smart, Live Better
Snap, speak, or type your food — AI handles the rest.

iOS Android Swift Kotlin UI Local-first privacy iOS 16 languages / Android 15 languages License GitHub stars App Store Google Play


Open-source, privacy-first calorie tracker for iOS and Android. Bring your own AI provider — 13 supported including Gemini, OpenAI, Claude, Grok, Groq, Hugging Face, Fireworks AI, DeepInfra, Mistral, and any custom OpenAI-compatible endpoint — or use optional Fud AI Premium on iOS for hosted Gemini + Deepgram access. Snap a meal, share a food photo into Fud AI, scan a barcode, combine two camera shots, add a note to a camera or library photo, ask your AI coach how to hit your goal, speak your lunch, or use Siri Shortcuts on iOS to log food and weight. On supported iPhones, food-description analysis for text, voice-transcribed, and Siri food logs can use Apple Intelligence on-device as the final fallback after Premium Gemini or BYOK provider/fallback attempts fail. No accounts, no cloud sync, no tracking.

iOS 4.4 build 25 makes goal calculation AI-powered — Recalculate Goals and onboarding compute your calories and macros via AI, refined from your logged intake and weight trend with a formula fallback — and merges Energy Burn Goals into a single Apple Health–aware Adaptive Goals toggle.

Android 2.2.2 build 25 fixes text food entry keyboard focus, adds native speech fallback when Android on-device language support is unavailable, and recommends Groq (Whisper) or Deepgram for more consistent voice transcription across Android phones.

App Store · Google Play · Website · Report an Issue · Request a Feature


Features

Logging

  • Snap food — camera identifies meals and estimates nutrition
  • Camera + Note — add a description with the photo for better accuracy
  • Camera + Camera — capture two images for one analysis, useful for front/back packaging or food + label combos
  • iOS Share Extension — send a food photo from Photos or another app directly into Fud AI for review and logging
  • Nutrition label scan — reads packaging for precise per-serving data
  • Barcode lookup — scan packaged foods on iOS and Android and fill nutrition from Open Food Facts when product data is available
  • Photo library — analyze existing photos
  • Photo library + Note — pick an existing photo and add context before AI analysis
  • Text input — type food descriptions
  • Voice input — speak your meals hands-free (6 STT options with per-provider language selection, see below)
  • iOS Siri Shortcuts — say phrases like "Log food in Fud AI", "Calories today in Fud AI", or "Log my weight in Fud AI"; the phrase guide lives in Settings → Siri Phrases
  • Manual Entry — log known calories and macros without AI
  • Smart serving units — AI can show slices, pieces, cups, ml, or other visible serving units while grams stay the source of truth
  • Review nutrition unlock — correct calories, macros, and detailed nutrients before logging, then lock again so serving changes scale from your edits
  • Meal What if? — preview how a reviewed meal changes today's calories and macros, then ask AI for a practical suggestion before logging
  • Saved Meals — Recents, Frequent, and Favorites with safer swipe actions, search, and drag-to-reorder

Intelligence

  • AI Coach tab — multi-turn chat with memory. Coach sees your profile, weight history, food log, today's date/timezone, and richer meal details, then answers questions like "what's my expected weight in 30 days?" or "how do I lose 2 kg?". Coach also supports camera/photo attachments on Android. Memory persists across launches; Reset button starts a fresh conversation. Long-press any reply to copy.
  • AI Access — choose free Bring Your Own Key or optional Fud AI Premium on iOS. BYOK lets you pick provider, model, fallback, custom instructions, and speech language directly on device; Premium uses Fud AI's Gemini + Deepgram proxy with daily safety limits and hides BYOK-only controls until you switch back.
  • Apple Intelligence fallback — on supported iPhones, food-description analysis for text, voice-transcribed, and Siri food logs can use Apple Intelligence on-device as the final fallback after Premium Gemini or BYOK provider/fallback attempts fail.
  • AI optional nutrient goals — estimate detailed nutrient goals from profile data without changing calorie/protein/carbs/fat formulas.
  • Goal-aware prompt chips — suggested questions change based on whether your goal is Lose / Gain / Maintain
  • Thermodynamic weight forecast — expected weight at 30/60/90 days, predicted vs observed weekly change, days-to-goal, under-logging detection. Surfaced through Coach as live context on every turn.
  • Resilient requests — transient provider overloads (503 / 529 / 429) auto-retry with 1s / 2s / 4s exponential backoff across both food analysis and Coach chat, so short spikes resolve invisibly

Tracking

  • Expanded nutrients per entry — macros plus sugar, fiber, fats, cholesterol, sodium, potassium, calcium, iron, magnesium, zinc, vitamins, folate, omega-3, and more when available
  • Custom Home nutrient cards — swap the top cards from protein/carbs/fat to fiber, sodium, vitamin D, calcium, or other tracked nutrients
  • Optional nutrient goals — set or AI-estimate goals for the non-macro nutrients; these stay separate from the calorie and macro calculator
  • Scrollable week calendar — swipe to any past week, configurable start day
  • Food log sorting — keep the default grouped view, or sort meal sections by latest logging order from the Home screen
  • Progress charts — weight trends, calorie history, macro averages (1W to All Time)
  • Progress summaries — weight and body-fat ranges show average and net change for the selected week, month, or longer window
  • Decimal nutrition totals — macros and detailed nutrients preserve decimal precision in logs, Home, widgets, and View More
  • Weight History — tap-to-delete past entries, syncs deletion to Apple Health
  • Goal tracking — set target weight, BMR/TDEE auto-calculation; goal-reached alert fires from both manual logs and Apple Health reads
  • Adaptive Goals (Experimental) — optional weekly calorie correction from observed weight trend; pinned macros stay pinned and unlocked macros auto-balance

Health & platform

  • Apple Health — bidirectional sync for body measurements + nutrition types written per meal; Siri food/weight logs write through the same HealthKit paths, and Experimental Energy Burn Goals can estimate calorie targets from active/total energy while macros stay editable
  • Health Connect — Android sync for nutrition, weight, and body fat, with permission reconciliation and backfill support; Experimental Energy Burn Goals can use recent energy data for calorie targets
  • Apple Watch — watchOS app and complications show calories and macros at a glance
  • Widgets — iOS Home Screen has Fud AI in Small, Medium, and Large plus a small-only Fud AI Protein widget; Lock Screen widgets stay separate, and Android Glance widgets update when you log
  • Android 2.2.2 update — Text food entry keeps the keyboard open while example placeholders rotate; native Android voice logging falls back when on-device language support is unavailable
  • Share the App — native iOS share sheet from About → forwards App Store URL plus a personalized message and fud-ai.app link; message body localized into all 16 iOS languages
  • Update check — About shows the installed app version, opens the App Store / Play Store when a newer version is available, and shows a tab dot for pending updates
  • Theme color — iOS and Android Settings let users change the app accent, with matching home screen / launcher icons
  • Languages — iOS supports 16 languages: Arabic, Azerbaijani, Dutch, English, French, German, Hindi, Italian, Japanese, Korean, Polish, Portuguese (Brazil), Romanian, Russian, Simplified Chinese, Spanish. Android supports the same set except Polish. The app auto-selects by the phone's Language setting; iOS 4.4 build 25 localizes the new Adaptive Goals description across all 15 non-English locales.
  • Meal reminders — customizable breakfast, lunch, dinner notifications
  • Dark mode — system, light, or dark
  • Metric & imperial units

AI Providers

Pick any of the 13 LLM providers for food analysis, meal what-if suggestions, optional nutrient-goal estimation, and Coach chat. Free Gemini keys are available at aistudio.google.com/apikey. In BYOK mode, requests go directly from your device to the provider you configure. On iOS, optional Fud AI Premium can instead use Fud AI's hosted Gemini + Deepgram proxy with daily safety limits. For text, voice-transcribed, and Siri food descriptions on supported iPhones, Apple Intelligence can run on-device only as the last fallback after Premium Gemini or BYOK provider/fallback attempts fail.

Provider Format Highlight Needs API Key
Google Gemini Gemini API Gemini 3.5 Flash / 2.5 Pro / Flash Yes
OpenAI OpenAI GPT-5 / 4o Yes
Anthropic Claude Messages API Sonnet 4.6 (default) / Opus 4.7 / Haiku 4.5 Yes
xAI Grok OpenAI-compatible Grok 4 Yes
OpenRouter OpenAI-compatible Any model, free-form IDs Yes
Together AI OpenAI-compatible Llama 4, Qwen VL Yes
Groq OpenAI-compatible Llama 4 Scout, very fast Yes
Hugging Face OpenAI-compatible Gemma 3, Qwen VL, Llama Vision (open-weight router, free-form IDs) Yes
Fireworks AI OpenAI-compatible Qwen VL, Llama Vision, Phi-3 Vision Yes
DeepInfra OpenAI-compatible Gemma 3, Llama Vision, Qwen VL Yes
Mistral OpenAI-compatible Pixtral Large / 12B (open-weight) Yes
Ollama OpenAI-compatible (local) Llama 3.2 Vision, LLaVA, Moondream — runs on your Mac No
Custom (OpenAI-compatible) OpenAI-compatible You set base URL + free-form model name Optional

Speech-to-Text Providers

Pick how voice input is transcribed. Native iOS / Android is the default — free, on-device where supported, real-time. On Android, native speech first tries the on-device language path, then falls back to Android recognition with network/provider defaults if the phone lacks offline support for that language. Each provider has its own language setting: use Provider Auto, Use Device Language, or an explicit language hint where supported.

Provider Notes
Native iOS / Android (On-Device) Free, offline where the phone supports the selected language, real-time partial results
Gemini Audio Batch audio transcription through Gemini for BYOK users
OpenAI Whisper Whisper-1 via /v1/audio/transcriptions
Groq (Whisper) Whisper-large-v3, very fast, has a free tier
Deepgram Nova-3, fast and accurate
AssemblyAI Universal model, strong accuracy, free tier

For Android phones where native speech is inconsistent, Groq (Whisper) or Deepgram are recommended alternatives; the developer currently uses Groq.

API keys are stored encrypted on-device: iOS Keychain on iOS and EncryptedSharedPreferences backed by Android Keystore on Android.

How It Works

Photo / Text / Voice
        │
        ▼
  BYOK provider API or Premium proxy
        │
        ├── BYOK provider fallback if configured
        └── iOS Apple Intelligence final fallback for text / voice transcript / Siri food descriptions
        │
        ▼
  JSON nutrition response
        │
        ▼
  User reviews & edits
        │
        ▼
  FoodStore.addEntry()  ──▶  UserDefaults (local) + Apple Health (optional)

For the Coach chat, every turn builds a slim system prompt from your live profile, BMR formula in use, computed forecast, today's date/timezone, and a one-line snapshot of available data. Coach then pulls any date range of weight, body fat, calorie totals, or food entries on demand via tool calling — ask "what was my weight in March?" or "show me my body fat trend over the last 6 months" and it fetches exactly the slice it needs, including meal source, meal type, serving size, and micronutrients.

Screenshots

An eight-screen walkthrough of the current app flow — from opening the dashboard to detailed nutrition and progress.

Home dashboard

01 · Home · Dashboard
Daily calorie ring, selected Home nutrient cards, and today's logged meals grouped by meal type. Week strip at the top for date navigation.
Food logging options menu

02 · Log · Options
Tap + to open Camera, Camera + Note, Camera + Camera, Nutrition Label, Barcode, Photos, Text, Voice, Manual Entry, Saved Meals, or Copy from Day.
Snap food capture

03 · Snap · Capture
Point and shoot. The image is sent to your chosen AI provider; nutrition estimates come back within a few seconds.
Review food entry

04 · Review · Edit
Review the AI's guess, unlock nutrition if values need correction, adjust the serving size (everything recalculates live), preview "What if?" impact, and pick a meal type before logging.
Meals log

05 · Meals · Log
The day's entries grouped by breakfast / lunch / dinner / snack. Swipe to delete, tap to edit any entry.
AI Coach chat

06 · Coach · AI Chat
Multi-turn conversation with full context of your profile, weight history, food log, and forecast. Ask "what should I eat?" or "expected weight in 30 days?".
Progress charts

07 · Progress · Charts
Weight trend with goal line, calorie history (intake vs. goal), and macro averages. Time ranges span 1 week to all time.
Detailed nutrition view

08 · View More · Nutrients
Detailed nutrition shows macro totals plus optional nutrients such as fiber, sugar, sodium, minerals, vitamins, and fats.

Calorie & Macro Calculation

The app calculates personalized daily targets using established nutrition science formulas:

Step Formula Details
BMR Katch-McArdle 370 + 21.6 × lean mass (kg) — used when body fat % is known
BMR Mifflin-St Jeor 10w + 6.25h − 5a ± 5 — fallback when body fat is unknown
TDEE BMR × activity Multiplier ranges from 1.2 (sedentary) to 2.0 (extra active)
Daily Calories TDEE + adjustment Adjustment = weeklyChangeKg × 7700 / 7 (deficit or surplus)
Protein Activity + goal 0.8 – 2.2 g/kg body weight by activity, plus +0.2 g/kg during cutting phase (Helms et al 2014); when body fat % is known, Activity Level also shows the equivalent g/kg lean-mass multiplier
Fat Fixed ratio 0.6 g/kg body weight
Carbs Auto-balanced Remainder from calories − protein − fat (any macro can be pinned; max 2 pinned)

All values can be manually overridden in Settings, with a Recalculate Goals button to snap back to formula defaults.

Architecture

Component Details
Language Swift 5, SwiftUI, iOS 17.6+
Storage UserDefaults (local JSON), Keychain (API keys)
AI GeminiService for food + label analysis, ChatService for multi-turn Coach chat, both route across all 13 providers
Speech Native SFSpeechRecognizer / Android SpeechRecognizer or remote providers via SpeechService (m4a upload)
Health HealthKit / Health Connect read-write paths for body measurements and meal nutrition, with UUID-tagged samples for safe delete
Pattern @Observable + .environment(), main actor isolation
Localization Localizable.xcstrings (String Catalog), 16 iOS languages, auto-selected by iPhone's system language
Dependencies Native platform frameworks; app data and API keys remain local

Repo Layout

fud-ai/
├── ios/          # SwiftUI iOS app (shipping on App Store, v4.3)
├── android/      # Kotlin + Jetpack Compose app (min SDK 26 / Android 8.0, v2.2.2)
├── web/          # Marketing site — https://fud-ai.app (static HTML/CSS, Vercel)
├── APPSTORE.md   # App Store Connect listing copy (iOS)
├── PLAYSTORE.md  # Google Play Console listing copy (Android)
└── README, LICENSE, CONTRIBUTING, SECURITY, CLAUDE.md, .github/

Source Layout (iOS)

ios/
├── calorietracker.xcodeproj/         # Xcode project
├── calorietrackerTests/              # Unit test target (boilerplate)
├── calorietrackerUITests/            # UI test target (boilerplate)
├── FudAIWidgets/                     # Widget extension target (Home + Lock Screen)
├── screenshots/                      # App Store screenshot sources
└── calorietracker/
    ├── calorietrackerApp.swift       # Entry point, environment setup
    ├── ContentView.swift             # 5-tab layout (Home, Progress, Coach, Settings, About)
    ├── Localizable.xcstrings         # String Catalog, 16 languages
    ├── Models/
    │   ├── AIProvider.swift          # 13 LLM providers, model lists, settings
    │   ├── SpeechProvider.swift      # 6 STT options + Keychain settings
    │   ├── ChatMessage.swift         # Coach chat message model
    │   ├── UserProfile.swift         # BMR/TDEE/macro calculations
    │   ├── FoodEntry.swift           # Food item with macros and expanded optional nutrients
    │   └── WeightEntry.swift         # Weight log entry
    ├── Views/
    │   ├── OnboardingView.swift      # 15-step onboarding flow
    │   ├── ChatView.swift            # Coach tab: bubbles, prompt chips, reset
    │   ├── FoodResultView.swift      # AI result review & edit
    │   ├── RecentsView.swift         # Saved Meals (Recents / Frequent / Favorites)
    │   ├── VoiceInputView.swift      # Native + remote STT routing
    │   ├── HomeComponents.swift      # Week strip, macro cards
    │   └── ProgressComponents.swift  # Charts, weight history
    ├── Services/
    │   ├── GeminiService.swift       # Food/label analysis, routes 13 providers
    │   ├── ChatService.swift         # Multi-turn Coach chat, routes 13 providers
    │   ├── SpeechService.swift       # Remote STT router (Gemini / OpenAI / Groq / Deepgram / AssemblyAI)
    │   ├── WeightAnalysisService.swift # Thermodynamic weight-forecast math
    │   ├── KeychainHelper.swift      # iOS Keychain wrapper
    └── Stores/
        ├── FoodStore.swift            # Food CRUD + favorites
        ├── WeightStore.swift          # Weight CRUD (auto-syncs profile weight)
        ├── ProfileStore.swift         # @Observable wrapper over UserProfile
        ├── ChatStore.swift            # Coach chat history (persisted locally)
        ├── NotificationManager.swift  # Notification scheduler
        └── HealthKitManager.swift     # Apple Health bridge (body + nutrition)

Build & Run

# Clone
git clone https://github.com/apoorvdarshan/fud-ai.git
cd fud-ai

iOS

xcodebuild -project ios/calorietracker.xcodeproj \
  -scheme calorietracker \
  -destination 'platform=iOS Simulator,name=iPhone 17 Pro' build

Open ios/calorietracker.xcodeproj in Xcode, select your device, and run.

Android

Open android/ in Android Studio (Narwhal or newer), let Gradle sync, hit ▶ Run. Or from the CLI:

export JAVA_HOME="/Applications/Android Studio.app/Contents/jbr/Contents/Home"
cd android
./gradlew :app:assembleDebug
adb install -r app/build/outputs/apk/debug/app-debug.apk
adb shell am start -n com.apoorvdarshan.calorietracker/.MainActivity

First launch walks you through onboarding (gender, birthday, height/weight with metric/imperial toggle, body fat %, activity with protein target preview, goal, goal speed, notifications, Apple Health / Health Connect, AI access setup, review). A free Gemini key is available at aistudio.google.com/apikey, or iOS users can choose optional Fud AI Premium. You can switch anytime in Settings → AI Access; BYOK provider/fallback/speech settings appear only while BYOK is selected.

Contributing

See CONTRIBUTING.md for guidelines. Bug reports and feature requests welcome.

Adding a new translation? Open ios/calorietracker/Localizable.xcstrings in Xcode and fill in your language column — everything else is already wired.

Security

See SECURITY.md. Use private vulnerability reporting for sensitive issues.

Privacy

No accounts, no cloud sync, no analytics. BYOK API keys are encrypted on-device and requests go directly to the provider you choose; optional iOS Premium requests go through Fud AI's Gemini + Deepgram proxy only for the request being processed. On supported iPhones, text, voice-transcribed, and Siri food descriptions can be processed by Apple Intelligence on-device as the final fallback after Premium Gemini or BYOK provider/fallback attempts fail. Barcode lookup sends the scanned barcode to Open Food Facts and stores the returned nutrition locally. Optional nutrient goals, Adaptive Goals preferences, Home nutrient-card choices, saved review nutrition edits, food photos from the app or iOS Share Extension, iOS Siri/App Intent food or weight phrases, cached thumbnails, widget snapshots, and Apple Watch nutrition snapshots are local preferences/data except for the specific provider, Premium proxy, or final on-device Apple Intelligence request needed to analyze a food description. AI estimation sends only the context needed for that request, such as reviewed meal + daily-total context for a meal what-if suggestion or Siri food text for Siri food logging. Apple Health / Health Connect energy-burn goals read active/total energy only after the user enables that setting. Delete All Data is local-only — it wipes the app's storage (food log, weight log, body-fat log, profile, Coach chat, saved meals, API keys, widget / Watch snapshot) but never touches Apple Health or Health Connect. Samples you've synced are yours; if you want them cleaned up, do it from Health / Health Connect settings. See Privacy Policy.

License

MIT License. See LICENSE.

Contact

Support the Project

Fud AI is fully free, open source, and privacy-first. If it helps you, consider supporting development — every bit keeps this project alive.

Ko-fi Product Hunt TrustMRR

You can also help by voting on Product Hunt, checking the TrustMRR listing, starring the repo, filing bugs, or requesting features.

Star History

Star History Chart

Contributors

Thanks to everyone who has contributed to making Fud AI better:

Contributors