 About OpenConstructionERP

Open-source construction ERP - BOQ, PDF/CAD/BIM takeoff, AI cost matching. 42 regional catalogues, 21 languages, 71 modules. AGPL-3.0. v3.0 - pip install openconstructionerp

Platforms

Web Self-hosted

Languages

TypeScript

Need Help Installing OpenConstructionERP?

We provide expert installation service for this software. Our team will install, configure, and secure OpenConstructionERP on your server. plans start at just $30.

OpenConstructionERP

View on GitHub

OpenConstructionERP

A leading open-source workspace for construction project management

Professional BOQ, 4D scheduling, 5D cost model, and tendering - all in one open-source platform.

Like WordPress for construction companies - pick modules from the marketplace, drop in your own, or replace ours with custom-built ones. Same plug-and-play model, but for BOQ, scheduling, cost control, BIM, and tendering.

▶ Watch the 12-min walkthrough · Demo · Documentation · Discussions · Report Bug

License Version PyPI Downloads (pepy · per month) Stars
Last commit Languages Cost Items

OpenConstructionERP - open-source construction ERP for BOQ, BIM takeoff, DWG/PDF quantification and 5D cost modeling

1-minute teaser above · for the full 12-minute walkthrough → watch on YouTube · onboarding → BoQ → BIM → DWG → PDF → AI → dashboard



Download the free desktop app

No Python, no Docker, nothing to set up. Pick your system and run it.

Download OpenConstructionERP for Windows    Download OpenConstructionERP for macOS    Download OpenConstructionERP for Linux

Not sure which file? openconstructionerp.com/download picks the right one for you automatically. Prefer the terminal? pip install openconstructionerp or Docker, see Quick Start below.


55K+
cost items
24
languages
48
regions
6
CAD formats
100+
modules
12
sections

Table of Contents

Get Started

Estimating & Costs

Project Lifecycle

Visualization & Coordination

Field & Quality

Setup & Standards

Technical

Community

Legal & Privacy


⭐ If you want to see new updates and database versions and if you find our tools useful please give our repositories a star to see more similar applications for the construction industry. Star OpenConstructionERP on GitHub and be instantly notified of new releases.





What's New in v6

v6 is the version where setup stops being a chore. Install the wheel, run one command, and the app boots into a full PostgreSQL database with the demo data already loaded. No Docker, no connection strings, no migration step. The whole platform now ships as 117 modules out of the box.

  • Embedded PostgreSQL 16 is the default runtime. The first run brings up a local PostgreSQL server bundled with the wheel, so there is nothing to install and nothing to configure. It just boots. If you want the lightest possible local setup, set OE_USE_SQLITE=1 and the app falls back to plain SQLite.
  • 117 modules out of the box, 27 languages, 55,000+ cost items. Everything is on by default, the full UI is translated, and the CWICR pricing data covers every major trade across 11 regional price sets.
  • Partner packs. Preset bundles you can pip install, drop into a folder as a zip, or upload right in the app. They apply live with no restart, so a partner deployment is one step.
  • Cost spine. Control accounts and cost lines give you a proper budget structure with FX-correct rollups. Amounts are grouped by currency and never blended, so totals stay honest across regions.
  • Geo hub. Cesium 3D Tiles in the browser plus a one-click "place project on the map", so every job site has real coordinates and shows up on the globe.
  • One-click country packs. Pick a country and the language, the local cost database and a couple of demo projects all install together in a single step.
  • Cross-platform CAD converters. The DDC cad2data converters auto-download on Windows, Linux and macOS, so RVT, IFC, DWG and DGN takeoff works the same everywhere.

See the latest release and the CHANGELOG for the per-release breakdown.


Why OpenConstructionERP?

Construction cost estimation software is expensive, closed-source, and locked to specific regions. OpenConstructionERP changes that.

What you get How it works
Free forever AGPL-3.0 license. No subscriptions, no per-seat fees, no vendor lock-in.
Your data, your server Self-hosted. Everything runs on your machine - nothing leaves your network.
27 languages Full UI translation: English, German, French, Spanish, Portuguese, Russian, Chinese, Arabic, Hindi, Japanese, Korean, and 16 more.
30+ regional standards DIN 276, NRM 1/2, CSI MasterFormat, GAEB, ГЭСН, DPGF, GB/T 50500, CPWD, ÖNORM, Birim Fiyat, Sekisan, SINAPI, and more.
AI-powered Connect any LLM provider (Anthropic, OpenAI, Gemini, Mistral, Groq, DeepSeek) for smart estimation.
55,000+ cost items CWICR database with 11 regional pricing databases (DACH, UK, US, France, Spain, Brazil, Russia, UAE, China, India, Canada).

How It Compares

Capability OpenConstructionERP Enterprise
BIM
CAD
Takeoff
Legacy
Estimating
PDF
Markup
LicenseAGPL-3.0 (free)ProprietaryProprietaryProprietaryProprietary
Self-hosted / offline✔✖✖⚠ partial✖
PriceFree forever~€500/mo~€300/mo~€200/mo~€30/mo
AI estimation✔ 7 LLM providers✖✖✖✖
UI languages275328
Regional standards30+432-
BOQ editor✔✔✔✔✖
CAD/BIM takeoff✔ RVT IFC DWG DGN✔✔✖PDF only
4D/5D planning✔✔✖✖✖
Cost database included✔ 55K+ rates✖ extra✖ extra✖ extra✖
Resource catalog✔ 7K+ priced✖ extra✖✖✖
Validation engine✔ 42 rules⚠ limited✖✖✖
REST API✔ full⚠ limited✖✖✖
Real-time collab✔ soft locks✔✖✖✖
Open data export✔ GAEB · XLSX · JSON⚠ limited⚠ limited⚠ limitedPDF only
IDS / COBie requirements✔ import + export✖✖✖✖
Property dev lifecycle✔ Lead → SPA → Handover✖✖✖✖
3D globe / geo-anchor✔ Cesium 3D Tiles⚠ map only✖✖✖

Comparison reflects typical category capabilities based on publicly available information as of Q1 2026. Pricing is approximate (per-seat, list price) and varies by vendor and region. OpenConstructionERP is an independent open-source project and is not affiliated with any commercial vendor in the categories above.


See It In Action

Each block below is a short GIF cut from the full walkthrough above - same order as the video, so you can jump to whichever workflow matters most. Prefer one continuous video? ▶ Watch the 12-minute walkthrough on YouTube.

1 · Role-Based Onboarding
Sign in as Admin / Estimator / Manager - the wizard pre-selects the right 17 of 46 modules for your role

Role-Based Onboarding
2 · New Project, Any Region
Pick currency, classification standard, regional factor - live map & weather come along for free

New Project Global
3 · Build the Bill of Quantities
Keyboard-first editor, 55K+ priced items, AI cost finder & Smart AI - quality score updates live

BoQ Editor
4 · BIM → BOQ Bulk Link
Link 100 Revit walls → one BOQ line with aggregated area / volume / length - no IfcOpenShell

Bulk Link BIM Group
5 · DWG Drawings & Layers
636 wall entities across 10 DWG layers - every one linkable to the BOQ, measured in place

DWG Layers
6 · PDF Takeoff
Drop a floorplan, measure distance / area / count, push the numbers straight into the BOQ

PDF Takeoff
7 · Complete Estimate - $6.26M
Real Revit project → 215 positions, 88 sections, CWICR-priced, quality score 99

Complete Estimate
8 · Every Module - BIM-Linked Tasks
Issues tied to exact model elements, tracked on a Kanban board alongside schedule, docs & requirements

Tasks Linked To BIM
9 · Data Explorer - Pivot → BOQ
CAD-BIM Explorer pivot becomes 10 BOQ positions in one click - charts, data bars & drill-down included

Data Explorer Pivot
10 · AI Estimate from a Photo
Upload a construction photo → GPT-4o + YOLO return a scoped BOQ in seconds, confidence-scored

AI Photo to Estimate
11 · Global Portfolio Dashboard
7 projects, 4 continents, $28.3M in active estimates - one workspace, one map

Projects Dashboard
Bonus · Instant Search
Find any of 55K+ cost items across 11 regional databases by keyword, unit or classification

Instant Search

A Look Inside

A quick tour of the main workspaces. Every screen is the real application running the seven-country demo that ships with a fresh install.

Portfolio Dashboard
Every project on one live map, with multi-currency totals that are grouped by currency, never blended.

Portfolio dashboard with world map and KPIs
Projects
Localized projects worldwide. Each card carries its site map, BIM / DWG / PDF badges and live value.

Projects overview with localized project cards
BOQ Editor
Keyboard-first bill of quantities with sections, assemblies, a live quality score and grand total.

Bill of Quantities editor
Cost Database
55,000+ priced items across 11 regional databases, bilingual, searchable by code, unit or class.

Regional cost databases
3D BIM Viewer
Federated models in the browser with a category and storey breakdown. Converted through DDC, no IfcOpenShell.

3D BIM viewer with element summary
Clash Detection
Geometric coordination across federated models, with a clash matrix and BCF export.

Clash detection across federated models
PDF Takeoff
Drop a drawing, let AI extract the quantities, then push them straight into the BOQ.

AI-assisted PDF takeoff
AI Estimate
Turn text, a photo, a PDF or a spreadsheet into a scoped BOQ in seconds, with confidence scores.

AI quick estimate
Validation
Built-in DIN 276, NRM and MasterFormat rules score every BOQ with a traffic-light report.

Validation report with traffic-light score
Cross-Project Analytics
Portfolio KPIs grouped by currency: budget, actuals and variance, project by project.

Cross-project analytics grouped by currency
Finance & Earned Value
Budgets, invoices, payments and earned value tracked against the estimate.

Finance and earned value management

Key Features

Bill of Quantities (BOQ) Management

BOQ Editor - Create, manage and analyze Bills of Quantities

Build professional cost estimates with a powerful BOQ editor. The full lifecycle - from first sketch to final tender submission:

  Upload              Convert            Validate           Estimate           Tender
 ┌────────┐        ┌──────────┐       ┌───────────┐      ┌──────────┐      ┌──────────┐
 │PDF/CAD │───────▶│ Extract  │──────▶│ 42 rules  │─────▶│BOQ Editor│─────▶│ Bid Pkgs │
 │Photo   │        │quantities│       │ DIN/NRM/  │      │ + AI     │      │ Compare  │
 │Text    │        │ + AI     │       │ MasterFmt │      │ + Costs  │      │ Award    │
 └────────┘        └──────────┘       └───────────┘      └──────────┘      └──────────┘
                                                               │
                                                         ┌─────┴──────┐
                                                         │ 4D Schedule│
                                                         │ 5D Costs   │
                                                         │ Risk Reg.  │
                                                         │ Reports    │
                                                         └────────────┘
  • Hierarchical BOQ structure - Sections, positions, sub-positions with drag-and-drop reordering
  • Inline editing - Click any cell to edit. Tab between fields. Undo/redo with Ctrl+Z
  • Resources & assemblies - Link labor, materials, equipment to each position. Build reusable cost recipes
  • Markups - Overhead, profit, VAT, contingency - configure per project or use regional defaults
  • Automatic calculations - Quantity × unit rate = total. Section subtotals. Grand total with markups
  • Validation - 42 built-in rules check for missing quantities, zero prices, duplicate items, and compliance with DIN 276, NRM, MasterFormat
  • Export - Download as Excel, CSV, PDF report, or GAEB XML (X83)

Cost Databases & Resource Catalog

Cost Database - 55,000+ items across 11 regions

Access the world's construction pricing data:

  • CWICR database - 55,000+ cost items covering all major construction trades. Available in 9 languages with 11 regional price sets
  • Smart search - Find items by description, code, or classification. AI-powered semantic search matches meaning, not just keywords ("concrete wall" finds "reinforced partition C30/37")
  • Resource catalog - 7,000+ materials, equipment, labor rates, and operators. Build custom assemblies from catalog items
  • Regional pricing - Automatic price adjustment based on project location. Compare rates across regions
  • Import your data - Upload your own cost database from Excel, CSV, or connect via API

CAD/BIM Takeoff & AI Estimation

CAD/BIM Takeoff and AI-powered estimation

Extract quantities from any source - drawings, models, text, or photos:

  Source              DDC cad2data         Canonical            Match              BOQ
 ┌────────┐         ┌──────────────┐    ┌──────────┐       ┌──────────┐      ┌──────────┐
 │.rvt    │         │ Element      │    │ Elements │       │ Classify │      │ Positions│
 │.ifc    │────────▶│ extraction   │───▶│ + Quants │──────▶│ (DIN/NRM)│─────▶│ + Linked │
 │.dwg    │         │ (no IFC OS)  │    │ + Props  │       │ + Costs  │      │ geometry │
 │.dgn    │         └──────────────┘    └──────────┘       └──────────┘      └──────────┘
 │.pdf    │                                                                         │
 │photo   │         ┌──────────────┐                                          ┌─────┴────┐
 │text    │────────▶│ CV / OCR / AI│──────────────────────────────────────▶  │ BIM Pick │
 └────────┘         │ (PaddleOCR + │                                          │ area/vol │
                    │  YOLOv11)    │                                          │ /length  │
                    └──────────────┘                                          └──────────┘
  • CAD/BIM takeoff - Upload Revit (.rvt), IFC, AutoCAD (.dwg), or MicroStation (.dgn) files. DDC converters extract elements with volumes, areas, and lengths automatically
  • Interactive QTO - Choose how to group extracted data: by Category, Type, Level, Family. Format-specific presets for Revit and IFC
  • Linked geometry preview - Click the BIM link badge on any BOQ position to see a 3D preview of linked elements with interactive rotate/zoom/pan controls
  • BIM Quantity Picker - Select quantities (area, volume, length) directly from linked BIM elements and apply them to BOQ positions. The source parameter name is shown next to the unit
  • DWG polyline measurement - Click any polyline in the DWG viewer to instantly see area, perimeter, and individual segment lengths with on-canvas labels
  • PDF measurement - Open construction drawings directly in the browser. Measure distances, areas, and count elements with calibrated scale
  • AI estimation - Describe your project in plain text, upload a building photo, or paste a PDF - AI generates a complete BOQ with quantities and market rates
  • AI Cost Advisor - Ask questions about pricing, materials, or estimation methodology. AI answers using your cost database as context
  • Cost matching - After AI generates an estimate, match each item against your CWICR database to replace AI-guessed rates with real market prices

Geo Hub (3D Globe)

Anchor every project on a real spherical earth - Cesium 3D Tiles 1.1 with live HUD and pin layers:

   Anchor              Globe                Mode               Deeplink            Fly-to
 ┌──────────┐       ┌──────────┐       ┌───────────┐       ┌────────────┐      ┌──────────┐
 │ Project  │       │ Cesium   │       │  Global   │       │ ?model=…   │      │ BIM scene│
 │ Plot     │──────▶│ 3D Tiles │──────▶│  Project  │──────▶│ ?plot=…    │─────▶│ PropDev  │
 │ CAD model│       │ live HUD │       │ Developm. │       │ ?dev_id=…  │      │ Daily Diary│
 └──────────┘       └──────────┘       └───────────┘       └────────────┘      └──────────┘
       ▲                  │                                                          │
       │                  ▼                                                          │
       │           ┌──────────────┐                                                  │
       └───────────│ Pin layers   │ ◀────── HSE · Punchlist · Daily Diary ◀──────────┘
                   └──────────────┘
  • Three-mode picker - Global (planet-wide portfolio), Project (job-site scale), Development (plot-level masterplan)
  • Live HUD - Cursor latitude / longitude, terrain altitude, dynamic scale bar, north arrow
  • Anchored Projects rail - Floating collapsible overlay showing every geo-anchored project, click to fly-to
  • Deeplinks - ?model=, ?plot=, ?dev_id=, ?phase=, ?block= survive page reloads and shareable URLs
  • Pin layers - HSE incidents, Punchlist items, Daily Diary entries plotted on the globe with category icons
  • "View on map" CTAs - One click from BIM viewer, PropDev plot, Daily Diary entry, Project card → globe with that asset selected
  • DWG / PDF raster overlay - Upload a site plan or floorplan, drag four corner pins onto the globe → the raster drapes over real terrain; polygon crop with vertex drag for cookie-cutter trimming
  • Canonical pipeline - POST /api/v1/geo-hub/from-canonical/{cad_import_id} turns any DDC cad2data conversion into glTF 3D Tiles via pure-Python pygltflib (no commercial toolkit needed)

Example: open a Berlin masterplan in Geo Hub, switch to Development mode, see all 12 plots colored by sale status, click one → reservation pipeline opens with that buyer pre-filtered.

Property Development

End-to-end real-estate developer workflow - from first lead to handover snags to warranty close-out:

   Lead          Reservation         SPA              Handover           Warranty
 ┌────────┐    ┌──────────┐     ┌──────────┐      ┌───────────┐      ┌──────────┐
 │ CRM    │───▶│ Hold +   │────▶│ Contract │─────▶│ Snags     │─────▶│ Defects  │
 │ inbox  │    │ deposit  │     │ + Escrow │      │ + Photos  │      │ liability│
 │ Broker │    │ schedule │     │ schedule │      │ + Sign-off│      │ + Promote│
 └────────┘    └──────────┘     └──────────┘      └───────────┘      └──────────┘
      │              │                │                  │                  │
      └──────────────┴────────────────┴──── Contact bridge (idempotent tags) ┘
                                              ▼
                                     ┌────────────────┐
                                     │ Price Matrix   │
                                     │ Phases · Blocks│
                                     │ House Types    │
                                     │ Brokers · Plots│
                                     └────────────────┘
  • Lead → Reservation → SPA → Handover → Warranty - Full lifecycle FSM with auto-creation of ContractParty on SPA conversion, Payment Schedule state machine, idempotent stage transitions
  • Sub-entity tabs - Phases · Blocks · Brokers · Price Matrix · Escrow - one screen for every dev operation, no page hops
  • House Type catalogue - ISO 3166-1 picker covering 180+ countries plus Custom region; CountryCombobox + HouseTypeEditModal share the same backend taxonomy as catalog & costs
  • SnagsBlock per handover - Photo upload, status (Open / Resolved / Disputed), one-click promote-to-warranty when a snag survives the defects-liability period
  • Contacts ↔ PropDev bridge - Every Lead and Buyer is idempotently tagged as a Contact via Contact.module_tags, so CRM and PropDev stay in sync without duplicates
  • Price Matrix - Per-phase × house-type × view-premium grid with currency-aware totals and bulk apply
  • Escrow - Per-buyer payment schedule with milestone receipts and outstanding balance roll-up
  • Bootstrap to Accommodation - One click on a development block creates a worker-camp / rental inventory in the Accommodation module (1:1 plots → rooms, idempotent)

Example: import a 240-unit residential masterplan, generate price matrix from house-type × view, push to globe, accept 18 reservations across 3 brokers, convert 11 to SPA, hand over 4, track 7 open snags in the warranty period - all in one app.

Accommodation

Accommodation module - worker camps, rentals and hotels in one place

One module for three lodging kinds - worker camps for site crews, rentals for staff, hotels for visiting consultants - with rooms, bookings and charges in a unified data model:

   PropDev block         Accommodation         Rooms              Bookings           Charges
 ┌──────────────┐      ┌──────────────┐    ┌────────────┐    ┌────────────┐    ┌────────────┐
 │ Plots #1..N  │──1▶──│ Worker camp  │───▶│ available  │───▶│ reserved   │───▶│ base rent  │
 │ (PropDev)    │ click│ Rental       │    │ occupied   │    │ checked_in │    │ extras     │
 │              │      │ Hotel        │    │ maintenance│    │ checked_out│    │ deposits   │
 └──────────────┘      └──────────────┘    │ blocked    │    │ cancelled  │    │ refunds    │
       ▲                     │             └────────────┘    └────────────┘    └────────────┘
       │                     ▼                                    ▲
       │              ┌──────────────┐                            │
       │              │ HR autobook  │ ◀──── lowest-labelled ─────┘
       │              │ (suggest+    │       available worker_camp room
       │              │  confirm)    │
       │              └──────────────┘
       │
   "Bootstrap to Accommodation" CTA
  • Three kinds, one module - worker_camp · rental · hotel, with tab filter and per-kind capacity counters on every card
  • Rooms with status - available · occupied · maintenance · blocked; 409 prevents booking into a blocked or maintenance room
  • Booking state machine - reserved → checked_in → checked_out with cancelled from any non-final state; idempotent same-state updates; final states locked
  • Charges with Decimal precision - Base rent, extras, deposits, refunds, all in the room's inherited currency (no hardcoded EUR)
  • PropDev bootstrap - One click on a development block iterates its plots and creates rooms 1:1, idempotent (running twice creates nothing extra)
  • HR autobook (suggest-confirm) - Pick an employee Contact → suggest the lowest-labelled available worker_camp room → human confirms with a real booking POST
  • BIM + Geo aware - bim_element_id carries through from PropDev plots; cards with geo_lat/geo_lon get a "Geo" deeplink to the globe
  • IDOR-hardened - Every helper returns 404 (never 403) on cross-tenant access; tested in backend/tests/modules/accommodation/

Example: 240-plot worker camp on a remote site - bootstrap from the PropDev block, HR autobooks 187 crew members from the Contacts directory over three weeks, base-rent charges roll up to the project P&L automatically.

Floating Chat with the ERP Database

Floating chat answering questions about projects, BOQ and schedule from live ERP data

Bottom-right floating chat on every page - talks to the entire ERP database through 17 typed tools (projects, BOQ items, schedule, validation, risks, CWICR search, BIM elements, full semantic search):

  Any page          Floating button       Panel + 17 tools     Streamed
 ┌────────┐        ┌──────────────┐     ┌──────────────┐     ┌──────────┐
 │/projects│       │  bottom-right │     │ get_projects │     │ tool card│
 │/boq    │──FAB──▶│   ◯ Message  │────▶│ search_cwicr │────▶│ rendered │
 │/geo    │        │   (badge: 3) │     │ create_boq   │     │ in chat  │
 └────────┘        └──────────────┘     └──────────────┘     └──────────┘
  • Always-on - Mounted in AppLayout, available on every route (Dashboard, BOQ, BIM, Geo, PropDev, Accommodation, all 111 modules)
  • Real ERP access - Reads/writes through tools, not LLM guesswork: get_all_projects, get_project_summary, get_boq_items, get_schedule, get_validation_results, get_risk_register, search_cwicr_database, get_cost_model, compare_projects, run_validation, create_boq_item, search_boq_positions, search_documents, search_tasks, search_risks, search_bim_elements, search_anything
  • Streamed responses - Tool-call cards (risk register table, BOQ summary, etc.) render inline as the model produces them
  • Provider-agnostic - Anthropic / OpenAI / Gemini / Mistral / Groq / DeepSeek behind the same tool interface

Coordination Hub & Clash AI

Clash detection across federated BIM models with a clash matrix and BCF export

Multi-disciplinary BIM coordination with AI-assisted issue triage:

  Federation         Raw clashes        Smart Issues       AI Triage         BCF 3.0
 ┌──────────┐      ┌────────────┐     ┌────────────┐    ┌────────────┐    ┌──────────┐
 │ ARC ·STR │      │ thousands  │     │ clustered  │    │ severity   │    │ Solibri  │
 │ MEP ·HSE │─────▶│ raw pairs  │────▶│ by zone +  │───▶│ rework $   │───▶│ Navisw.  │
 │ models   │      │ + distance │     │ disciplines│    │ confidence │    │ BIMcollab│
 └──────────┘      └────────────┘     └────────────┘    └────────────┘    └──────────┘
                                            │                                  ▲
                                            ▼                                  │
                                    ┌─────────────┐                            │
                                    │ Smart Views │  IDS + COBie owner drops ──┘
                                    │ RFI · Tasks │
                                    │ Cost Impact │
                                    └─────────────┘
  • Coordination Hub - Single dashboard fusing clashes, RFIs, submittals, action items per model federation
  • Smart Views v1 - Saved filters across the federation (e.g. "MEP-vs-STR clashes > 50mm in Level 03")
  • Clash Smart Issues - Auto-group thousands of raw clash results into prioritized issue clusters by location + discipline pair
  • AI Triage - LLM ranks new clashes by severity / rework cost / location criticality with confidence scores
  • Cost Impact rollup - Per-issue rework estimate driven by your cost database, surfaced on the dashboard
  • BCF 3.0 / OpenCDE export - Round-trip with Solibri, Navisworks, BIMcollab via the open BIM standard
  • BIM Requirements - IDS (Information Delivery Specification) and COBie import / export for owner-side data drops

4D Scheduling & 5D Cost Model

4D Schedule module listing projects with planned durations and linked cost models

Plan your project timeline and track costs over time:

  • Gantt chart - Visual project schedule with drag-and-drop activities, dependencies (FS/FF/SS/SF), and critical path highlighting
  • Auto-generate from BOQ - Create schedule activities directly from your BOQ sections with cost-proportional durations
  • Earned Value Management - Track SPI, CPI, EAC, and variance. S-curve visualization shows planned vs actual progress
  • Budget tracking - Set baselines, compare snapshots, run what-if scenarios
  • Monte Carlo simulation - Risk-adjusted schedule analysis with probability distributions

Tendering, Risk & Reporting

Complete your estimation workflow:

   BOQ           Bid Package        Distribute         Compare           Award
 ┌────────┐    ┌────────────┐    ┌────────────┐    ┌────────────┐    ┌──────────┐
 │ priced │───▶│ subset +   │───▶│ Subs (mail │───▶│ side-by-   │───▶│ winner   │
 │ sections    │ instructions    │ + portal)  │    │ side mirror│    │ + change │
 │        │    │ + scope    │    │            │    │ + anomalies│    │   orders │
 └────────┘    └────────────┘    └────────────┘    └────────────┘    └──────────┘
                                                          │                │
                                                          ▼                ▼
                                                   ┌─────────────────────────┐
                                                   │ Reports · GAEB X83      │
                                                   │ Risk Register · EAC     │
                                                   └─────────────────────────┘
  • Tendering - Create bid packages, distribute to subcontractors, collect and compare bids with side-by-side price mirror
  • Change orders - Track scope changes with cost and schedule impact analysis
  • Risk register - Probability × impact matrix, mitigation strategies, risk-adjusted contingency
  • Reports - Generate professional PDF reports, Excel exports, GAEB XML. 12 built-in templates
  • Documents - Centralized file management with version tracking and drag-and-drop upload

Requirements & Quality Gates

Track and validate construction requirements with the EAC (Entity-Attribute-Constraint) system:

  • EAC Triplets - Capture requirements as structured data: Entity (wall), Attribute (fire_rating), Constraint (≥ F90)
  • 4 Quality Gates - Completeness → Consistency → Coverage → Compliance. Run sequentially to validate requirements
  • BOQ Traceability - Link each requirement to BOQ positions for full traceability from spec to estimate
  • Bulk Import - Import requirements from structured text (pipe-delimited format)
  • Categories - Structural, fire safety, thermal, acoustic, waterproofing, electrical, mechanical, architectural

PDF Markups & Annotations

Annotate construction drawings and documents directly in the browser:

  • 10 markup types - Cloud, arrow, text, rectangle, highlight, polygon, distance, area, count, stamp
  • Custom stamps - Approved, Rejected, For Review, Revised, Final + create your own with logo and date
  • Scale calibration - Set real-world scale per page for accurate measurements
  • Markups List - Table view of all annotations with filters, search, and CSV export
  • BOQ Integration - Link measurements directly to BOQ positions (quantity = measured value)

Punch List

Track construction deficiencies from discovery to resolution:

  • 5-stage workflow - Open → In Progress → Resolved → Verified → Closed
  • Location pins - Mark exact position on PDF drawings (x/y coordinates)
  • Priority levels - Low, Medium, High, Critical with color coding
  • Photo attachments - Upload photos of deficiencies from the field
  • Categories - Structural, mechanical, electrical, architectural, fire safety, plumbing, finishing
  • PDF Export - Generate punch list reports for stakeholder review
  • Verification control - Different user must verify (not the resolver)

Daily Diary & HSE

Field-level reporting and safety tracking that holds up in court:

  • Daily Diary - Weather-aware entries (auto-pulled from project geo-coordinates), crew on site, equipment used, deliveries, delays, photos
  • HSE Incidents - Near-miss → first-aid → recordable → lost-time taxonomy with mandatory root-cause and corrective-action fields
  • OSHA-recordable flag - Server-side default backing for compliant regulatory exports (300 / 300A / 301)
  • Photo capture with EXIF / GPS - Field photos preserve location and timestamp metadata; magic-byte upload validation for defence-in-depth
  • Geo-anchored pins - Daily Diary and HSE pins surface on the Geo Hub globe layer for portfolio-level safety dashboards

30+ Regional Standards

Standard Region Format
DIN 276 / ÖNORM / SIA Germany / Austria / Switzerland Excel, CSV
NRM 1/2 (RICS) United Kingdom Excel, CSV
CSI MasterFormat United States / Canada Excel, CSV
GAEB DA XML 3.3 DACH region XML
DPGF / DQE France Excel, CSV
ГЭСН / ФЕР Russia / CIS Excel, CSV
GB/T 50500 China Excel, CSV
CPWD / IS 1200 India Excel, CSV
Bayındırlık Birim Fiyat Turkey Excel, CSV
積算基準 (Sekisan) Japan Excel, CSV
Computo Metrico / DEI Italy Excel, CSV
STABU / RAW Netherlands Excel, CSV
KNR / KNNR Poland Excel, CSV
표준품셈 South Korea Excel, CSV
NS 3420 / AMA Nordic countries Excel, CSV
ÚRS / TSKP Czech Republic / Slovakia Excel, CSV
ACMM / ANZSMM Australia / New Zealand Excel, CSV
CSI / CIQS Canada Excel, CSV
FIDIC UAE / GCC Excel, CSV
PBC / Base de Precios Spain Excel, CSV

Validation & Compliance Engine

Ensure your estimates meet regulatory standards before submission:

  • 42 built-in rules across 13 rule sets - DIN 276, NRM, MasterFormat, GAEB, and universal BOQ quality checks
  • Real-time validation - Run checks with Ctrl+Shift+V. Each position gets a pass/warning/error indicator
  • Quality score - Overall BOQ quality percentage (0-100%) visible in the toolbar
  • Drill-down - Click any finding to jump directly to the affected BOQ position and fix it
  • Custom rules - Define project-specific validation rules via the rule builder or Python scripting

Guided Onboarding

Get productive in under 10 minutes:

  1. Choose language - Select from 27 languages. The entire UI switches instantly
  2. Select region - Determines default cost database, currency, and classification standard
  3. Load cost database - One-click import of CWICR pricing data for your region (55,000+ items)
  4. Import resource catalog - Materials, labor, equipment, and pre-built assemblies
  5. Configure AI (optional) - Enter an API key from any supported LLM provider
  6. Create your first project - Set name, region, standard, and start estimating

Quick Start

Prefer to see it first? ▶ Watch the 12-minute walkthrough on YouTube - onboarding → BoQ → BIM → DWG → PDF → AI → dashboard.

Easiest: download the desktop app (no Python, no setup)

Download the installer for your operating system, run it, and OpenConstructionERP opens as a native desktop app. No Python, no pip, no Docker, and no database to set up. Everything runs locally on your machine.

The first launch takes about a minute while it sets up your local database, then every launch after that is fast. Open source under AGPL-3.0.

Prefer the command line? The options below (pip, Docker, source) need Python 3.12+. Check with python --version.

pip install (full app, one command)

pip install --upgrade openconstructionerp
openconstructionerp

That's it. The single wheel ships the backend plus the pre-built React frontend. The first run sets up a local embedded PostgreSQL database (no Docker, no setup), loads the demo data, opens your browser at http://localhost:8080, and you sign in with [email protected] / DemoPass1234!. No Node.js and no extra services. Every later run, just type openconstructionerp again. PyPI package.

If the openconstructionerp command is not found after install, run it through Python instead. This works on every operating system and never depends on PATH:

python -m openconstructionerp

"Command not found"? You do not need to touch PATH

If your terminal says openconstructionerp: command not found (macOS/Linux) or 'openconstructionerp' is not recognized (Windows), the package installed fine. pip just put the launcher in a per-user scripts folder that is not on your PATH. You have three options, easiest first.

1. Run it through Python (simplest, no setup). This works from any folder, on every OS, and never depends on PATH. We recommend this:

python -m openconstructionerp

Every command works this way: python -m openconstructionerp serve, python -m openconstructionerp doctor, and so on.

2. Let pipx handle PATH for you. pipx installs the app in its own isolated environment and puts the openconstructionerp command on your PATH automatically:

python -m pip install --user pipx
python -m pipx ensurepath        # then close and reopen the terminal
pipx install openconstructionerp
openconstructionerp

3. Add the scripts folder to PATH yourself, if you want the short openconstructionerp command. Pick your platform:

Windows

First find the folder pip used (it is printed as a warning during install, usually %APPDATA%\Python\Python3xx\Scripts):

python -m site --user-base

Add \Scripts to that path. Then either:

  • Permanent (recommended): open the Start menu, search for "Edit environment variables for your account", edit the Path variable, and add the folder (for example C:\Users\you\AppData\Roaming\Python\Python312\Scripts). Open a new terminal and openconstructionerp works.
  • This session only:
    set PATH=%APPDATA%\Python\Python312\Scripts;%PATH%
    
    (replace Python312 with your version).
macOS / Linux

pip installs user scripts to ~/.local/bin. Add it to your PATH by appending one line to your shell profile (~/.zshrc on modern macOS, ~/.bashrc on most Linux):

echo 'export PATH="$HOME/.local/bin:$PATH"' >> ~/.zshrc   # or ~/.bashrc
source ~/.zshrc                                            # or ~/.bashrc
openconstructionerp

Ubuntu / Debian users: on Ubuntu 23.04+ (including Ubuntu 26) and Debian 12+, pip install into the system Python fails with error: externally-managed-environment (PEP 668). The simplest fix is pipx (above), which is built for exactly this. If you prefer a venv:

sudo apt install -y python3.12 python3.12-venv
python3.12 -m venv venv && source venv/bin/activate
pip install --upgrade openconstructionerp

Full Linux guide with system deps and troubleshooting: docs/INSTALL_LINUX.md.

If something looks off, run openconstructionerp doctor (or python -m openconstructionerp doctor) for a per-check OK/WARN/ERROR report.

Alternative 1: One-line installer (handles PATH for you)

# Linux / macOS
curl -fsSL https://raw.githubusercontent.com/datadrivenconstruction/OpenConstructionERP/main/scripts/install.sh | bash

# Windows (PowerShell)
irm https://raw.githubusercontent.com/datadrivenconstruction/OpenConstructionERP/main/scripts/install.ps1 | iex

If you would rather not think about PATH at all, use this. It picks Docker if installed, otherwise uv, otherwise a dedicated Python virtual environment, installs OpenConstructionERP there, puts the openconstructionerp command on your PATH automatically, and finishes with a short panel showing the URL, the demo login and how to start. It also offers to launch right away. Open a new terminal afterwards and openconstructionerp just works. Runs at http://localhost:8080.

Alternative 2: Docker

Fastest, using the published image:

docker run -d -p 8080:8080 -v oe_data:/data ghcr.io/datadrivenconstruction/openconstructionerp:latest

Or build from source:

git clone https://github.com/datadrivenconstruction/OpenConstructionERP.git
cd OpenConstructionERP
make quickstart

Open http://localhost:8080. The published image starts in seconds; a from-source build takes ~2 minutes.

Alternative 3: Local development (clone + npm + uvicorn)

git clone https://github.com/datadrivenconstruction/OpenConstructionERP.git
cd OpenConstructionERP

# Install dependencies
pip install -e ./backend[server]
cd frontend && npm install && cd ..

# Start (Linux/macOS)
make dev

# Start (Windows - two terminals)
# Terminal 1: cd backend && uvicorn app.main:create_app --factory --reload --port 8000
# Terminal 2: cd frontend && npm run dev

Open http://localhost:5173 - for hacking on the codebase. Requires Python 3.12+ and Node.js 20+.

Demo Accounts

Three demo accounts are created automatically on first start. Each password is generated per installation (via secrets.token_urlsafe) and printed to the backend startup log so you see it immediately, e.g.:

[seed] Demo user created: [email protected] / xK7p_Q2nR8sT4uV6wX9yZ
[seed] Pre-set DEMO_USER_PASSWORD env to skip random generation

The same passwords are also persisted to ~/.openestimator/.demo_credentials.json (chmod 600) so you can recover them later. To pin known passwords (e.g. for a team demo or CI), set the env vars before the first boot:

Account Email Password Role
Admin [email protected] see startup log or .demo_credentials.json Full access
Estimator [email protected] see startup log or .demo_credentials.json Estimator
Manager [email protected] see startup log or .demo_credentials.json Manager

On a local default install you can simply type DemoPass1234! on the sign-in form for any demo account. The built-in demo login accepts it, so the documented credential always works. The per-install random password above is the stored hash, kept for reference and for API tokens. This shortcut turns off whenever SEED_DEMO=false, which you should set for any internet-exposed deployment.

Demo accounts include 5 pre-loaded projects from Berlin, London, New York, Paris, and Dubai with complete BOQs, schedules, and cost models.

Security note. For any internet-exposed deployment, set the three DEMO_*_PASSWORD variables to strong, unique secrets, or disable demo accounts entirely with DISABLE_DEMO_ACCOUNTS=1. Do not reuse passwords from examples, screenshots, or earlier versions of this README.


Tech Stack

Layer Technology Purpose
Backend Python 3.12+ / FastAPI Async API, Pydantic v2 validation, modular architecture
Frontend React 18 / TypeScript / Vite SPA with code splitting, 27 language bundles
Database PostgreSQL 16+ / SQLite (dev) OLTP with JSON columns, zero-config SQLite for development
UI Tailwind CSS / AG Grid Professional data grid, responsive design, dark mode
AI Any LLM via REST API Anthropic, OpenAI, Gemini, Mistral, Groq, DeepSeek
Vector Search LanceDB (embedded) / Qdrant Semantic cost item search, 384d or 3072d embeddings
CAD/BIM DDC cad2data RVT, IFC, DWG, DGN → structured quantities
i18n i18next + 27 language packs Full RTL support (Arabic), locale-aware formatting

Architecture

How the platform turns raw CAD/BIM into structured ERP data

OpenConstructionERP - Digitalization of Processes: Pipelines for Automatic Data Creation

OpenConstructionERP is built around seven cooperating pipelines that turn closed CAD/BIM files (RVT, IFC, DWG, DGN, PLN, TSK) into structured, queryable ERP data - without locking you into a proprietary stack. Every module in the platform plugs into one or more of these stages:

  1. Mining - collect existing project data (CAD/BIM models, CDE drops, COBie deliverables) into a semi-structured pool. Handled by cad, documents, bim_hub, file_search modules + the DDC cad2data converters (RVT/IFC/DWG/DGN/PLN → canonical JSON).
  2. QTO Check & Quantity Take-off rules - apply rule sets per discipline / family / type to extract quantities deterministically. Handled by takeoff, requirements, validation, and the rule editor in match-elements.
  3. BlackBox (company standard) - codify your firm's classifications, formulas, unit factors and assembly recipes as a single canonical rule book (COBie / CFIHOS / SQL / Excel / Access). Handled by costs, assemblies, catalog, cost_intelligence.
  4. New project modeling - apply the BlackBox to a fresh model: geometry → filtering → grouping → verification → BOQ. Handled by boq, projects, match-elements, clash.
  5. BlackBox mapping - map a new project's raw element list onto the canonical rule book via vector + lexical + rule-based matchers. Handled by match-elements (7-stage pipeline) + AI Estimate.
  6. Project-specific data (4D/5D/6D) - derive scheduling, cost, hours, ordering and environmental footprint per group. Handled by scheduling, advanced_schedule, 5d_planner, risk, carbon, hse.
  7. Saving data & Machine Learning - persist project history into the database, data lake and ML models so each new project starts further ahead. Handled by analytics, bi_dashboards, ai_chat, cost_intelligence, and the rule-learning loop in clash (Wave A4) and match-elements.

The right-hand side of the diagram is the automatic data retrieval layer that every UI surface (Dashboard, BOQ editor, /clash, /match-elements, /files, /scheduling) consumes: dashboards, calculations, reports, tables, charts, geometries, and ERP-ready exports - all driven from the same canonical store. The Machine-Learning column on the far right is where the platform progressively automates classification, parameterisation, recognition and marking, replacing manual steps () with automatic steps () over time.

This pipeline is the reason OpenConstructionERP can replace several commercial point-solutions with a single self-hosted stack - every module reads from and writes to the same canonical data layer.

Technical stack

flowchart TB
    UI["Frontend SPA<br>React 18, TypeScript, Vite<br>AG Grid, Tailwind, PDF.js"]

    subgraph Backend ["FastAPI Backend, 111 modules"]
        CORE["Core<br>Module loader, Event bus, Hooks, RBAC<br>Validation, FSM + audit log"]
        ESTIM["Estimating<br>BOQ, Costs, Catalog, Assemblies<br>Takeoff, BIM Hub, Match-Elements, 5D"]
        FIELD["Field Operations<br>Service, Equipment, Daily Diary<br>Portal, Resources & Crew"]
        COMM["Commercial<br>CRM, Contracts, Subcontractors<br>Bid Management, Variations, Suppliers, Property Dev"]
        QSAFE["Schedule & Quality<br>Advanced Schedule (LPS/CPM/EVM)<br>QMS, HSE, Carbon & ESG, BI Dashboards"]
        AIS["AI<br>AI Chat SSE, AI Estimate, Cost Intelligence<br>7 LLM providers"]
        CORE --> ESTIM
        CORE --> FIELD
        CORE --> COMM
        CORE --> QSAFE
        CORE --> AIS
    end

    subgraph Data ["Data layer"]
        PG[("PostgreSQL 16<br>SQLite in dev")]
        VEC[("Vector DB<br>LanceDB / Qdrant")]
        S3[("MinIO / S3<br>files, CAD, PDFs")]
    end

    subgraph Pipelines ["Pipelines"]
        CAD["DDC cad2data<br>RVT, IFC, DWG, DGN to canonical JSON"]
        CV["CV / OCR<br>PaddleOCR 3.0, YOLOv11<br>PDF takeoff, symbol detection"]
    end

    UI -- "REST, SSE" --> CORE
    BIZ --> PG
    BIZ --> VEC
    BIZ --> S3
    CAD --> BIZ
    CV --> BIZ

    classDef fe fill:#1f6feb,stroke:#0d3885,color:#fff;
    classDef be fill:#238636,stroke:#104822,color:#fff;
    classDef ai fill:#db6d28,stroke:#7a3c14,color:#fff;
    classDef data fill:#8250df,stroke:#4a2c7d,color:#fff;
    class UI fe
    class CORE,BIZ be
    class AIS ai
    class PG,VEC,S3,CAD,CV data
Plain-text version (for screen readers or non-Mermaid renderers)
┌──────────────────────────────────────────────────┐
│  Frontend (React SPA)                            │
│  TypeScript · Tailwind · AG Grid · PDF.js        │
└──────────────────┬───────────────────────────────┘
                   │ REST + SSE
┌──────────────────┴───────────────────────────────┐
│  Backend (FastAPI)                               │
│  111 auto-discovered modules · Plugin system     │
├──────────────────────────────────────────────────┤
│  BOQ · Costs · Schedule · 5D · Validation · AI   │
│  Takeoff · Tendering · Risk · Reports · Catalog  │
│  Requirements · Markups · Punch List · BIM Hub   │
│  PropDev · Geo Hub · Coordination · Clash AI     │
│  Accommodation · Floating Chat · 10 widgets      │
├──────────────────────────────────────────────────┤
│  Database (PostgreSQL / SQLite)                  │
│  Vector DB (LanceDB / Qdrant)                    │
│  CAD Converters (DDC cad2data)                   │
│  CV Pipeline (PaddleOCR + YOLOv11)               │
└──────────────────────────────────────────────────┘

Support the Project

OpenConstructionERP is built and maintained by the community. If you find it useful:

Security

OpenConstructionERP includes security hardening for production deployments:

  • Path traversal protection on all file download endpoints
  • CORS wildcard blocking in production mode
  • Bounded input validation on bulk price operations
  • Generic error responses to prevent account enumeration
  • Production startup checks for secrets, credentials, and database configuration

Do not open public GitHub issues for security vulnerabilities. Report privately via GitHub Security Advisories or by email to [email protected]. See SECURITY.md for the full coordinated-disclosure policy, response timelines, supported versions, scope, and regulatory-reporting obligations under EU Regulation 2024/2847 (Cyber Resilience Act).

AI disclaimer

AI suggestions produced by this software are preliminary estimates. A qualified construction-estimation professional must verify all quantities, classifications, and costs before any contractual or tender-submission use. See NOTICE and TERMS.md §4.

Trademarks

All product names, logos, and trademarks referenced in this repository are property of their respective owners. Any comparative references to commercial categories or products are made for fair comparative purposes based on publicly available information. OpenConstructionERP is an independent project and is not affiliated with, endorsed by, or sponsored by any third-party trademark owners. Full attributions in NOTICE.

Export control

This software contains cryptographic functionality (bcrypt password hashing, JWT signing). Export is classified under US EAR 740.17 (TSU mass-market exemption) and EU Regulation 2021/821 (dual-use). The Software is not authorised for download, use, or re-export to jurisdictions subject to comprehensive OFAC sanctions. See NOTICE for the full notice.

License

AGPL-3.0 - see LICENSE. Third-party attributions in NOTICE.

You can freely use, modify, and distribute this software. If you modify and deploy it as a service, AGPL §13 requires you to make the corresponding source code available under the same licence.

For commercial licensing without AGPL obligations, see COMMERCIAL-LICENSE.md or contact [email protected].

Privacy and terms


Follow on X Subscribe on YouTube Connect on LinkedIn Watch the 12-minute walkthrough

DDC Logo
Unlock the Power of Data in Construction
Move to full-cycle data management where only unified
structured data & processes remain and where your data is yours